GHG System Case
Case specifically for use with the Figaro NGM2611-E13, Adafruit DHT22, AtlasScientific EZO-CO2 sensor, and 6 D cell batteries. Which informs the sensor plate, cable glands, and power supply (length of case and nylon bar). [TODO: If we removed / generalized the sensor plate and cable glands requirements / instructions this could generally be for a 12" elongated case]: #
Bill of Materials and Potential Supplier or Drawing
Diagrams
Fig. 1 : Annotated Case Diagram
Fig. 2 : Sensor Panel
Fig. 3 : Back and Cage Panel
Build Process
Tools & Skills
Fabrication
Reed TC4QP Tubing Cutter for plastic pipe to cut ABS to length
Measuring tape
#2 phillips head screw driver
Power drill and 1/4" drill bit
Assembly
2x 9/16 SAE combination wrench for hex nuts
Milwaukee 6in Diagonal Cutting Pliers for copper mesh and cable ties
Parts Fabrication
Cut two 1-21/32" length sections of ABS and 1x 8-1/4" length for the hub inserts and main housing section. When making hub inserts, 20/32 to 22/32 is acceptable, too little won't hold the o-ring in place, too much won't compress the o-ring enough to seal properly.
these lengths may vary depending on brand of coupler, length to cut the ABS sections the O-rings will go around are based on compressing the O-ring around 25% of it's width of 0.21" = 0.1575" or ~5/32"
for the NIBCO brand coupler we found a depth of 1 1/2", so 1 1/2" + 5/32" = 1 21/32"
we also found the center barrier in the coupler is measured at around 1/4", 1 21/32" + 1/4 = 1 29/32", 12" - 2x 1 29/32" = ~8 1/4"
Mark placement of battery holder screw placements on Nylon bar
Drill 3/32" pilot holes into nylon bar (for #6 screws) according to battery holder placement centered on bar, then screw battery holder into nylon bar
Cut 20" of copper mesh
Assembly & Waterproofing
Attach cable glands
Apply a small amount of molycote to O-Ring on each cable gland
Fit cable glands through their respective holes in acrylic sensor plate
Tighten plastic nut on cable gland gently but firmly to ensure waterproof seal
Assemble main sonde housing (ABS or PVC)
Assemble O-Ring ledge
Find 2 3" pipe D-couplers and 2 1-21/32" sections of 3" pipe
Apply plastic cement primer to one end of each D-coupler and one end of each pipe section
Apply plastic cement to primed end of D-coupler.
Insert primed end of each pipe section into primed and cemented end of each D-coupler
Tap with rubber mallet to ensure complete insertion, and visually check that that there is no gab between the 1-21/32" pipe section and the insertion ridge inside the D-coupler. This is essential to ensure the correct ledge height for the O-Ring.
Check O-ring ledge assembly for correct height.
Place an O-ring on the ledge created by the inner pipe inserted into the D-coupler in the above steps
Check that at least 1.5mm of relief exists between the O-ring and the inner pipe segment for the entire circumference of the O-ring.
The typical reason for a defect at this stage is incomplete insertion of the inner pipe segment into the D-coupler, which can easily compromise waterproofing.
Correct assembly results:

Assemble housing body
Find 2ft length of 3" pipe and 2 O-Ring ledge assembles from (i)
Check O-ring ledge assembly for correct height
Checking for a good seal on each O
Apply plastic cement primer to open end of D-coupler on O-Ring ledge assembly and both ends of 2 ft pipe.
Apply plastic cement to open and primed end of O-Ring ledge assembly
Firmly insert primed 3" pipe ends into primed and cemented ends of the D-coupler on each O-Ring ledge assembly.
Let cure for 3 hours
Build case
Find 6 threaded steel rods, 24 bolts, 24 washers, 2 O-rings, one sensor plate with cable glands attached, and 2 cage/back plates, and the housing body assembled in (2)
Build starts from the cage side of the sonde case and proceeds to the back.
For each hole in the cage plate, sandwich the plate between two washers and two nuts screwed onto the end of a threaded steel rod.
Screw a nut about 1 inch onto the rod
Slide a washer up to the nut
Slide the cage plate onto the rod
Slide a washer up to the cage plate
Tighten a 2nd nut up to the cage plate.
Repeat for each hole in the cage plate.
Result looks like this:

Next, use nuts and washers to create a ledge for the sensor plate to rest on.
Stand the housing from (2) upright, and turn the assembly from (iii) upside down and place on top of the housing. The cage plate will be facing upward.
Mark each steel rod, using a marker or masking tape, 1 inch paste the height of the housing. This will be the location of the ledge.
Take the assembly from (2) back off the housing and place cage plate side down on the table.
Screw a nut onto each threaded rod up to the point that has been marked
Place a washer on top of each nut
Place the sensor plate onto the six rods and allow to rest on the 6 nuts and washers there just installed.
Visually inspect that the sensor plate is reasonably flat and all six washers are at the same level.
Now, place O-rings and attach the back plate
Place an O-ring on the O-ring ledge of one side of the housing from (2)
Apply a thin layer of molykote to the entire surface of the O-ring
Place the housing on the sensor plate and between the six rods, with the side with the installed O-ring facing down.
Place a second O-ring on the O-ring ledge on the other side of the housing
Apply a thin layer of molykote to the entire surface of the second O-ring
Place the back plate onto the six rods
Install a nut and washer onto each rod, and firmly screen them down onto the back plate.
Check that all six sensor plate nuts are tight, and all six back plate nuts remain tight. Tighten any nuts that appear to be loose.
Visually inspect O-rings for any signs of improper compression
Over-tightening: O-ring can squish out of place
Under-tightening: O-ring is not in contact with acrylic plate in some location
Attach sensors (This step can also happen before step 5 with some experience doing assembly)
Disassemble sonde case by removing the back panel, then the housing, then the sensor plate.
Apply a thin layer of molykote to the inside of the cable glands
Thread sensor cables (without connectors attached) through the cable glands
Tighten cable glands to provide waterproof seal
Reassemble sensor place, housing, and back plate onto the 6 steel rods as in (5)
Assembly can now be dunk tested for waterproofness
Internal Assembly
Ensure sonde case is disassembled
Cut a 1" section of velcro.
Attach velcro to back of RRIV datalogger PCA and open area on plastic rod
Plug battery plug into RRIV datalogger
Assemble sensor connectors
Place batter/datalogger assembly upright on top of sensor plate.
Plug sensors into datalogger
Reassemble sonde case
Copper mesh
Wrap copper mesh around sensor cage
Secure copy mesh to sensor cage using zip ties
Last updated